Precision Planning - Construction Excellence through Advanced Work Packaging (AWP): A Practical Impl

68,40 €

Envío desde 5,00€
Pago tc Acepta Pago tc

Estado del lote: Muy Bueno (nuevo o como nuevo, sin señales de uso)

Impresión Bajo Demanda: Este libro se imprime bajo demanda. El plazo de entrega depende de la impresión, que se inicia una vez que el comprador abona el pedido.

Autor: Jose Gabriel Rosas Jimenez

Editorial: Jose Gabriel Rosas

Año: 04/10/2026

ISBN: 9798998389610

Encuadernación: Tapa blanda

Páginas: 456 pp.

Idioma: eng

EAN: 9798998389610


This book is a practical guide to implementing Advanced Work Packaging (AWP) in construction projects.
It answers questions such as:
How can you visualize an EWP, PWP, CWP, or IWP?Can CWPs become the main activities in the Level 3 schedule? How can Waterfall planning support long-term decisions? How can Agile methods improve medium- and short-term planning? Why do some projects have hundreds of thousands of activities? Can a large project be managed as a group of mini-projects? How can work packages be defined by discipline? How can IWPs be visualized in the 3D model?
The book explains the role of AWP in the digital transformation of construction. Its purpose is to improve planning, visibility, coordination, and traceability from engineering through field execution. It describes the information needed to connect engineering, procurement, construction, scheduling, and project controls.
The Front-End Planning section explains Construction Work Areas, Construction Work Packages, discipline-based CWPs, and the Path of Construction. It shows how to identify constraints, estimate construction duration, perform a backward pass, create mini-projects, and connect the Path of Construction to the Level 3 schedule.
The execution sections cover Engineering and Procurement Work Packages, rigging, scaffolding, safety, Workface Planning, and Installation Work Packages. Readers learn how to combine long-term Waterfall planning with Agile lookahead and weekly planning. Installed quantities, rules of progress, and Earned Value Management are connected to field control.
The book also explains how the 3D model can become a shared project database and visual planning tool. A detailed case study shows how packages, constraints, schedules, progress rules, and model information work together.
El envío se realizará en 48/72hrs.
avatar Clandestink
Desde 13/04/2021
España (Guadalajara)
Vendedor registrado como profesional.